News
Home > News > Content
Thermal Paper Slitting Machine Installation And Use Adjustment
- Jan 09, 2019 -

After the thermal paper slitting machine is unpacked, the integrity of the machine should be checked, and the damage during transportation should be checked. After the damage is checked, the calibration level can be installed on a flat and solid basis. After installing the calibration level, check whether the parts are intact, whether the bolts are tightly tightened, whether the moving parts are flexible, and then add the corresponding lubricating oil to each lubrication part. Check the refueling and confirm that it is correct before starting. First read the instructions that came with you carefully. Start slowly and start slowly. When everything is normal, slowly increase the cutting speed until it is normal.