After unpacking, please check the integrity of the slitting rewinding machine, check whether there is any damage during transportation, and install the calibration level on a smooth and solid basis after inspection. After installing the calibration level, fully inspect whether all parts are intact, whether the fastening bolts are tightened reliably, and whether the moving parts are flexible. Then add the corresponding lubricating oil to each lubrication part, and check that the fueling is completed without error before starting the machine. First read the accompanying instructions carefully. When the slitting rewinding machine starting to run slowly, wait until everything is normal and slowly increase the slitting speed to reach normal.
Latest News
Contact Us
- Patsons Building No.8 South Zhenxing Road Sections 2, Qixing Industry Zone, Jiaxing City
- eng@rewindingmachinery.com
- +86-573-82571515; +86-573-82571313
Slitting Rewinder Installation
Apr 12, 2018
You Might Also Like
Send Inquiry





